Koli's free tools · Feasibility

What can you build here?

Type any property address. Koli reads the parcel, the zoning, and the state law that overrides it — then tells you what you can build, what it will rent for, and what it is worth. One free report.

Free · ~60 seconds · honest about what's still pending City verification. No fabricated numbers.
One address. The whole brain.

Type it in. Koli forms around it.

The moment you enter an address, Koli forms a dedicated model around it — one property, one mind. HostDesk data, work orders, and a real concierge light up right away — no listing required. Your PMS, persona, property and pricing stay dim until you connect them. You see exactly what's ready and what lights up next.

  • Lit now — HostDesk data, work orders, concierge
  • Lights up when you connect

A flywheel — data flows in, Koli acts, and every outcome flows back and makes it sharper. It compounds every night.

One address, three answers

The questions a listing can't answer.

Comps tell you what a place rents for as it stands. Koli prices the upside — the units the parcel could hold, under the state law that overrides local zoning, with the market math to back it.

What you can build

Buildable units

Parcel, zoning, and overlay resolved, then the binding state-law layer (SB 79, ADU law, density bonus) applied — with the unit-count arithmetic shown, not asserted.
What it'll rent for

True nightly rate

A revenue model from real comparable short-term and long-term listings nearby — labeled as estimates, drawn from a ~170-city corpus.
What it's worth

Development upside

As-is versus by-right versus state-law scenarios, side by side — the earning potential of the property you could build, not just the one standing today.
A sample report

The verdict first. Then the math.

Koli leads with the headline number, shows the arithmetic behind it, and flags what's still pending the City. Here's how an output reads — illustrative, not a measured claim.

Every figure in a real report is CITED to a named source or marked PENDING — preliminary, pending City verification.

Koli · Feasibilitysample output
live
Headline verdict
~24 units by-right via SB 79 — a confirmed transit + high-quality-transit parcel where state law sets the floor (100 du/ac × 0.2414 ac = 24.1 → 24 units).
Sample — modeled on a real SB 79 transit-band parcel
Real reports, already generated

Two parcels. Two honest verdicts.

These are real reports Koli's Buildability Engine produced — quoted with their actual status flags. Where the local standards weren't in corpus, the report says so and falls back to the binding state law. That candor is the deliverable.

847 N San Gabriel Ave — the Starbase Azusa compound
Real generated report
Starbase Azusa

~24 units by-right via SB 79

847 N San Gabriel Ave, Azusa, CA · APN 8608-021-001 · LA County

Local TD standards not found — California state law (SB 79) sets the binding pathway.

  • Zone TD · lot 0.2414 acCITED
  • Local TD standardsNOT_FOUND
  • 100 du/ac × 0.2414 = 24 unitsCITED
  • Built unit count + permitsPENDING
Real generated report
1235 Chapel Ave

3 units, up to 4 via SB 9

1235 / 1233 S Chapel Ave, Alhambra, CA · APN 5348-022-016 · LA County

Conservative basis = 3 units; SB 9 (up to 4) survives the automated checks but is not yet decision-grade.

  • RL zone, no overlayCITED
  • 1 legal SFR + 2019 rear unitCITED
  • Rear-unit permit classPENDING
  • SB 9 lot-split + two-unitPENDING

Findings quoted from real HostDesk Buildability Engine reports. Every value is cited to a named source or flagged pending — preliminary, pending City verification.

The honesty contract

Confident on the numbers. Candid on the gaps.

Most feasibility tools hide their uncertainty to look authoritative. Koli does the opposite — it labels what's confirmed, what's pending, and what it refused to guess. That candor is what makes the confident parts worth trusting.

CITED

Every figure has a source

Zone, lot, units, coordinates — each value traces to a named source (Assessor, ArcGIS, manifest), not an assumption.

PENDING

Gaps are shown, not filled

Where something needs City confirmation — a permit class, a base-density table — it's marked pending. The pending items are the deliverable.

NOT_FOUND

A refusal beats a guess

When local standards aren't in corpus, the engine refuses to invent numbers and falls back to the binding state-law pathway — honestly, in the open.

Every report is preliminary and pending City verification — directional, not a permit. The honesty is the point.

What can your property do?

One address. One free report. Honest about what's still pending.